A recent job on a clean water site where the client asked us to remove approx. 150mm of existing gravel from the top of a clean water storage tank roof and the exterior filter drain.
We then Installed new teram, twin wall pipe and a new geo grid layer on the roof. Finally we disposed of the old gravel off site and supplied and installed new 40mm clean gravel.
Recent project on a clean water siteSara2024-10-25T14:11:10+00:00